TEMPLATES · ANY METHOD

Pick the method. The room changes shape.

Start from a template and the whole board speaks that method. SAFe becomes a train, Kanban enforces WIP limits, the shop floor gets its andon. Cards drag between lanes in every one.

TRAIN THEME13 boards

SAFe

Scaled Agile Framework events and artifacts, named as SAFe names them.

PI Planning boardTeam breakoutROAM risk boardPI planning boardConfidence voteInspect & AdaptEpic / Lean business caseValue stream and ART identification+5 more

On the board: Iteration capacity bars turn pink when a team is overloaded.

SPRINT THEME5 boards

Scrum

The Scrum Guide's events and artifacts: Product Backlog, Sprint Planning, Sprint Backlog, Daily Scrum, Sprint Review, Sprint Retrospective.

Product BacklogSprint PlanningSprint Backlog boardSprint ReviewSprint Retrospective

On the board: The Sprint Backlog warns when it passes the team's velocity.

FLOW THEME5 boards

Kanban

The Kanban Method: visualise, limit WIP, manage flow, explicit policies, feedback loops (cadences), improve.

Team KanbanKanban system boardSTATIK canvasService delivery reviewOperations review (flight levels)

On the board: A full column refuses new cards: WIP limits are enforced, not suggested.

OBEYA THEME6 boards

Lean

Lean thinking and the Toyota way: A3, PDCA, value stream mapping, kaizen, obeya, hoshin kanri.

Obeya wallA3 problem solvingPDCA boardValue stream map (current and future state)Kaizen newspaperHoshin kanri X-matrix

On the board: Left to right, one problem, one sheet.

LAB THEME7 boards

Six Sigma

DMAIC and its tools: project charter, SIPOC, voice of the customer, fishbone, FMEA, control plan.

DMAIC project boardProject charterSIPOCVoice of the customer → CTQ treeFishbone (Ishikawa, 6M)FMEAControl plan

On the board: Work moves forward as evidence arrives, phase by phase.

FACTORY THEME6 boards

Manufacturing

Shop-floor management: SQDC tiered boards, andon, OEE, heijunka, 5S, gemba walks.

SQDC tiered boardAndon and line statusOEE trackerHeijunka box5S audit boardGemba walk

On the board: Stations with hard limits; stop the line when quality slips.

PLAIN THEME4 boards

General

Practices every method shares.

RetrospectiveOKR treeDependency mapUser story map

On the board: Plain boards for any team. No jargon required.

THREE STEPS
1

Pick a method

The template list, the board's look and its vocabulary follow the method you choose.

2

Size it to your teams

Boards are created with your teams and iterations already in place.

3

Or bring your own

Import from Miro, Mural, Trello, monday.com or iObeya, save it as a template, or start a blank whiteboard and add any template to it.

ACADEMY · TEMPLATES
$249/ train / month

Every method, unlimited people per train, the Jira app and Azure DevOps extension, SSO and an audit trail. 30-day free trial; yearly is $199 a month. Practice includes the templates free for one hosted room.